1300 853 564

Over a period of time the team at TMOT undertook a systematic project of continuous improvement by converting over 250 lights from fluro tubes to LED’s over a number of areas in the complex.

It was a big undertaking that required problem solving and planning and one that Tradesmen on Time handled seamlessly for Chris the body corporate manager at he Watermarque Apartments and Watermarque on the Park in the Hamilton Reach development in Brisbane as well as conducting the regular maintenance electrical and compliance checks at the Watermarque Apartments Complexes and servicing the private maintenance needs of the residents.

Download Case Study

Pin It on Pinterest

Share This
Case Study, Watermarque Apartments Hamilton Watermarque Apartments Hamilton Case Study